|
|
|||||||
| Political Forum « Politics from lebanon and the world... » |
![]() |
|
|
Share | Thread Tools | Search this Thread |
|
|
#1 |
|
Registered Member
Last Online: 10-14-2022
Join Date: Dec 2006
Posts: 10,467
Thanks: 14,136
Thanked 4,244 Times in 2,547 Posts
Groans: 186
Groaned at 198 Times in 120 Posts
|
أعلن وزير الطاقة والمياه ألان طابوريان إعتماد نظام جديد للتغذية بالتيار الكهربائي يساوي بين جميع المناطق بما فيها بيروت الإدارية بحيث لا تكون هناك افضلية لمنطقة على حساب أخرى، كاشفاً عن البدء باستجرار الطاقة خلال اسبوعين
okey , now wer talking!! , that means we will have 14 hours of elec. a day , and when the 200 mw comes from egypt we will have 16 hours a day.
__________________
problems of performance appraisal is that it sucks to memorize them |
|
|
|
|
|
#2 |
|
info@sync.com.lb
Last Online: 11-29-2020
Join Date: Apr 2006
Posts: 3,827
Thanks: 1,348
Thanked 2,391 Times in 1,306 Posts
Groans: 0
Groaned at 16 Times in 15 Posts
|
we need more
we should take advantage from the wind each house should have an "heolienne" i want to build mine after i finish my senior project wind power is clean and sheap
__________________
http://www.gamync.com Lebanese Produced Mobiles Games by http://www.sync.com.lb |
|
|
|
| The Following User Says Thank You to Sheriff Ice For This Useful Post: | SysTaMatIcS (09-04-2008) |
|
|
#3 |
|
Registered Member
Last Online: 10-14-2022
Join Date: Dec 2006
Posts: 10,467
Thanks: 14,136
Thanked 4,244 Times in 2,547 Posts
Groans: 186
Groaned at 198 Times in 120 Posts
|
I support u on that , would that cover 50% of each house need of elec.? or how much?
__________________
problems of performance appraisal is that it sucks to memorize them |
|
|
|
|
|
#4 |
|
info@sync.com.lb
Last Online: 11-29-2020
Join Date: Apr 2006
Posts: 3,827
Thanks: 1,348
Thanked 2,391 Times in 1,306 Posts
Groans: 0
Groaned at 16 Times in 15 Posts
|
LOL man since lebanon has more than 200 days of wind per year this will cover 100% of the needed power since the wind power can be saved
__________________
http://www.gamync.com Lebanese Produced Mobiles Games by http://www.sync.com.lb |
|
|
|
| The Following User Says Thank You to Sheriff Ice For This Useful Post: | SysTaMatIcS (09-05-2008) |
|
|
#5 |
|
Community Moderator
Last Online: 05-07-2013
Join Date: Jan 2006
Posts: 6,895
Thanks: 770
Thanked 4,271 Times in 2,417 Posts
Groans: 0
Groaned at 17 Times in 8 Posts
|
Systa,To2 Wmout,Ma3am Wala Ra7 Trou7 L Kahraba
![]() ![]() Sorry For Arabic In Latin Font..Bas Karazne
Last edited by Rami_s; 09-04-2008 at 08:13 PM. |
|
|
|
|
|
#6 |
|
Registered Member
Last Online: 06-22-2023
Join Date: Sep 2006
Posts: 1,304
Thanks: 102
Thanked 1,147 Times in 619 Posts
Groans: 8
Groaned at 1 Time in 1 Post
|
|
|
|
|
|
|
#7 |
|
Ma ghayro
Last Online: 04-19-2018
Join Date: Dec 2005
Posts: 5,592
Thanks: 1,765
Thanked 4,201 Times in 2,361 Posts
Groans: 12
Groaned at 18 Times in 11 Posts
|
Let's hope that happens, great job by the new minister...
In fact in our region we were getting like 10 hours electricity per day while the region just 200 meters away like 14-15 hours a day for unknown reasons. Now it became equal to 12 hours.
__________________
http://twitter.com/danymoussa
|
|
|
|
| The Following User Says Thank You to xcoder For This Useful Post: | SysTaMatIcS (09-05-2008) |
|
|
#8 | |
|
Ma ghayro
Last Online: 04-19-2018
Join Date: Dec 2005
Posts: 5,592
Thanks: 1,765
Thanked 4,201 Times in 2,361 Posts
Groans: 12
Groaned at 18 Times in 11 Posts
|
Quote:
:PYou are freedom fighters, i know that deep inside you don't mind it :P
__________________
http://twitter.com/danymoussa
|
|
|
|
|
| The Following User Says Thank You to xcoder For This Useful Post: | Tawa (09-04-2008) |
|
|
#9 |
|
Registered Member
Last Online: 10-14-2022
Join Date: Dec 2006
Posts: 10,467
Thanks: 14,136
Thanked 4,244 Times in 2,547 Posts
Groans: 186
Groaned at 198 Times in 120 Posts
|
leh rami sekin b west beirut? anywayz it will start on15-9 no today not tommorow, and it WILL happen , let em taste wat we have been tastin all of our lives , tak l dajanteur , nzal rfa3 l 3ilbi!! [ so he walks down 12 floors to raise it up , then he walks up 12 floors back to his home , cuz theres no elec. for the lifter
]
__________________
problems of performance appraisal is that it sucks to memorize them |
|
|
|
|
|
#10 | |
|
Registered Member
Last Online: 12-17-2012
Join Date: Jan 2006
Posts: 2,996
Thanks: 319
Thanked 1,119 Times in 872 Posts
Groans: 1
Groaned at 6 Times in 6 Posts
|
Quote:
|
|
|
|
|
| The Following User Says Thank You to KeXasthur For This Useful Post: | SysTaMatIcS (09-05-2008) |
![]() |
|
| Tags |
| 2124, beirut, bye, electricity |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|